0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Influence of Solutions Adopted at the Stage of Planning the Building Investment on the Accuracy of Cost Estimation

Author(s):
Medium: journal article
Language(s): English
Published in: Procedia Engineering, , v. 54
Page(s): 625-635
DOI: 10.1016/j.proeng.2013.03.057
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.proeng.2013.03.057.
  • About this
    data sheet
  • Reference-ID
    10669985
  • Published on:
    18/06/2022
  • Last updated on:
    18/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine