0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Influence of delay in utility shifting for extension of time claims in road construction projects in Sri Lanka

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10779560
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine