0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Influence of constant total hydraulic head on pore pressure and water inflow of grouted tunnel calculated by complex variable method

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2023.105071.
  • About this
    data sheet
  • Reference-ID
    10709127
  • Published on:
    21/03/2023
  • Last updated on:
    21/03/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine