0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom

This publication lists 51 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10611639
  • Published on:
    18/06/2021
  • Last updated on:
    18/06/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine