0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Incentive genetic algorithm based time–cost trade-off analysis across a build–operate–transfer project concession period

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1139/l10-118.
  • About this
    data sheet
  • Reference-ID
    10129803
  • Published on:
    03/12/2018
  • Last updated on:
    03/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine