0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Improving the performance of Earned Value Analysis as a construction project management tool

Author(s):
Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 4, v. 7
Page(s): 399-411
DOI: 10.1108/eb021162
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/eb021162.
  • About this
    data sheet
  • Reference-ID
    10575755
  • Published on:
    27/02/2021
  • Last updated on:
    27/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine