0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Improving the flood control at a lower cost for a future Hydro-Québec hydroelectric facility on the Toulnustouc River, Canada

Author(s):

Medium: journal article
Language(s): English
Published in: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, , n. 4, v. 30
Page(s): 775-779
DOI: 10.1139/l03-013
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1139/l03-013.
  • About this
    data sheet
  • Reference-ID
    10125295
  • Published on:
    03/12/2018
  • Last updated on:
    03/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine