0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Improving Estimate at Completion (EAC) Cost of Construction Projects Using Adaptive Neuro-Fuzzy Inference System (ANFIS)

Author(s): (Islamic Azad University Shiraz, 201580, Industrial Engineering, Shiraz, Fars, Iran (the Islamic Republic of);)
(Islamic Azad University Shiraz, 201580, Industrial Engineering, Shiraz, Fars, Iran (the Islamic Republic of);)
(Iran University of Science and Technology, 56944, Industrial Engineering, Tehran, Tehran, Iran (the Islamic Republic of);)
(Southeast University, 12579, Civil Engineering, Nanjing, China, Nanjing, China, 210096;)
Medium: journal article
Language(s): English
Published in: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, , n. 2, v. 49
Page(s): 1-11
DOI: 10.1139/cjce-2020-0399
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1139/cjce-2020-0399.
  • About this
    data sheet
  • Reference-ID
    10600660
  • Published on:
    17/04/2021
  • Last updated on:
    17/02/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine