0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Improving construction management practice with the Last Planner System: a case study

This publication lists 14 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10576413
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine