Improvement of Criteria Significance Determination/Kriterijų reikšmingumų nustatymo tobulinimas
Author(s): |
A. Kaklauskas
|
---|---|
Medium: | journal article |
Language(s): | Latvian |
Published in: | Journal of Civil Engineering and Management, March 1996, n. 5, v. 2 |
Page(s): | 64-70 |
DOI: | 10.3846/13921525.1996.10531549 |
Abstract: |
Having determined the significances of criteria by expert methods, we learn how much one of the criteria is more significant over another one. However, having determined by these methods the significances of technical-economical criteria (TEC) (they can be expressed in monetary or natural form: price and production costs of products, maintenance costs, construction time, labour expenditures, etc.), we do not find out everything we need. For instance, quantitative chracteristics of TEC in this case are not fully evaluated. Therefore a method should be developed enabling realistic and accurate assessment of these quantitative changes. The paper presents the method suggested by the author for significance determination of criteria, taking into account their quantitative and qualitative characteristics. |
Copyright: | © 1996 The Author(s). Published by VGTU Press. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.58 MB
- About this
data sheet - Reference-ID
10363947 - Published on:
12/08/2019 - Last updated on:
02/06/2021