Improved Precast Production–Scheduling Model Considering the Whole Supply Chain
Author(s): |
Zhaojing Wang
Hao Hu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Computing in Civil Engineering, July 2017, n. 4, v. 31 |
Page(s): | 04017013 |
DOI: | 10.1061/(asce)cp.1943-5487.0000667 |
- About this
data sheet - Reference-ID
10258508 - Published on:
29/12/2018 - Last updated on:
29/12/2018