0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안 (Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects)

This publication lists 4 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10761830
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine