Implications of the long term bridge performance program for life cycle costing in the United States
Author(s): |
Steve Chase
Hamid Ghasemi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structure and Infrastructure Engineering, February 2009, n. 1, v. 5 |
Page(s): | 3-10 |
DOI: | 10.1080/15732470701322719 |
- About this
data sheet - Reference-ID
10143073 - Published on:
06/12/2018 - Last updated on:
06/12/2018