0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Implementing earned value management using bridge information modeling

Author(s):

Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 5, v. 18
Page(s): 1302-1313
DOI: 10.1007/s12205-014-0455-9
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-014-0455-9.
  • About this
    data sheet
  • Reference-ID
    10172280
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine