0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Implementing Actuated Control of Diamond Interchanges

Author(s): (Grad. Res. Asst., School of Civ. Engrg., Purdue Univ., West Lafayette, IN 47907. E-mail: enelson@ecn.purdue.edu)
(Grad. Res. Asst., School of Civ. Engrg., Purdue Univ., West Lafayette, IN 47907. E-mail: enelson@ecn.purdue.edu)
(Grad. Res. Asst., School of Civ. Engrg., Purdue Univ., West Lafayette, IN 47907. E-mail: enelson@ecn.purdue.edu)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 5, v. 126
Page(s): 390-395
DOI: 10.1061/(asce)0733-947x(2000)126:5(390)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-947x(2000)126:5(390).
  • About this
    data sheet
  • Reference-ID
    10634194
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine