0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Implementation of visualization as planning and scheduling tool in construction

Author(s):


Medium: journal article
Language(s): English
Published in: Building and Environment, , n. 5, v. 38
Page(s): 713-719
DOI: 10.1016/s0360-1323(02)00239-1
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/s0360-1323(02)00239-1.
  • About this
    data sheet
  • Reference-ID
    10392967
  • Published on:
    26/11/2019
  • Last updated on:
    26/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine