The Impact of Change Orders Caused by Legislative Changes on Program Management in the UAE Construction Industry
Author(s): |
Yara Mattar
Mhd Amer Alzaim Mariam AlAli Inas Alkhatib Salwa Beheiry |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Buildings, 24 April 2024, n. 5, v. 14 |
Page(s): | 1294 |
DOI: | 10.3390/buildings14051294 |
Copyright: | © 2024 by the authors; licensee MDPI, Basel, Switzerland. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
Download full text file (PDF)
0.92 MB
Advertisement
Advertisement
0.92 MB
- About this
data sheet - Reference-ID
10787596 - Published on:
20/06/2024 - Last updated on:
20/06/2024