0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Identification and Assessment of Uncertainty Factors that Influence the Transaction Cost in Public Sector Construction Projects in Pakistan

This publication lists 63 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10324841
  • Published on:
    22/07/2019
  • Last updated on:
    02/06/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine