I-BIM based approach for geotechnical and numerical modelling of a conventional tunnel excavation
Author(s): |
Stefania Fabozzi
Salvatore Antonio Biancardo Rosa Veropalumbo Emilio Bilotta |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, February 2021, v. 108 |
Page(s): | 103723 |
DOI: | 10.1016/j.tust.2020.103723 |
- About this
data sheet - Reference-ID
10526120 - Published on:
11/12/2020 - Last updated on:
19/02/2021