Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
Author(s): |
A. Samer Ezeldin
Ahmed Soliman |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, January 2009, n. 1, v. 135 |
Page(s): | 42-55 |
DOI: | 10.1061/(asce)0733-9364(2009)135:1(42) |
- About this
data sheet - Reference-ID
10155970 - Published on:
07/12/2018 - Last updated on:
07/12/2018