0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hybrid System Method of Industrialised Building System (IBS): a Review of Studies

Author(s):

Medium: journal article
Language(s): English
Published in: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 932
Page(s): 012045
DOI: 10.1088/1757-899x/932/1/012045
Abstract:

A new technology in construction has implemented Industrialised Building System (IBS) as an adoption of a new method. Till date, the reception of Industrialised Building System (IBS) has been effectively advancing by Construction Industry Development Board (CIDB). Several of exertions have been taken, for example tremendous of research financing, preparing, and building up standard and other showcasing plan. From previous writing and industry report, the appropriation of IBS was practiced gainful to improve the construction quality and profitability and spare expense and also the duration of completion projects. However, there are still a few issues and problems, such as supply chain and design drawing issues, which has always been one of the biggest problems that should be taken care of in the construction industry. Nowadays, Industrialised Building System (IBS) also has been modified in many ways to make it more practical to use in the construction field. The IBS usage becomes a trend and also a requirement for a government project especially in the northern region of Malaysia such as Kedah and Perlis. Hence, this paper focuses on latest review which is about the new method implements in Industrialised Building System (IBS) technology, which is known as a Hybrid System method. This system is not yet to be found since it is one of the pilot projects from the government. Thus, the survey for this paper will evaluate the outcome whether the new Hybrid System method leads to delay in Industrialised Building System (IBS) or it can help to improve the deferrals of construction.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1757-899x/932/1/012045.
  • About this
    data sheet
  • Reference-ID
    10675061
  • Published on:
    12/06/2022
  • Last updated on:
    12/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine