0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World Environment

This publication has been cited in the following 6 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10560400
  • Published on:
    03/02/2021
  • Last updated on:
    19/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine