Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem
Author(s): |
Rifat Sonmez
Mustafa Gürel |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), November 2016, n. 6, v. 32 |
Page(s): | 04016020 |
DOI: | 10.1061/(asce)me.1943-5479.0000468 |
- About this
data sheet - Reference-ID
10371708 - Published on:
29/08/2019 - Last updated on:
29/08/2019