The hybrid model for selecting location of mobile cranes in bridge construction projects
Author(s): |
Mohamed Marzouk
Mohamed Hisham |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | The Baltic Journal of Road and Bridge Engineering, September 2013, n. 3, v. 8 |
Page(s): | 184-189 |
DOI: | 10.3846/bjrbe.2013.23 |
- About this
data sheet - Reference-ID
10084727 - Published on:
30/11/2018 - Last updated on:
30/11/2018