HPP Parbati (India) Inclined Shafts
TBM Concept, Segmental Lining and Site Experience
Author(s): |
W. Gütter
Ch. Barwart |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geomechanik und Tunnelbau, 2008, n. 6, v. 1 |
Page(s): | 543-550 |
DOI: | 10.1002/geot.200800059 |
Abstract: |
Stage II of the 2,000 MW HPP Parbati in Himachal Pradesh, a northern district of India at the lesser Himalayan zone, will generate a total power of 800 MW. A Joint Venture of Jäger Bau GmbH (Austria) and Seli SpA (Italy) completed together with Gammon India Ltd. in December 2006 the first inclined shafts in India driven by a double shield tunnel boring machine. The two parallel 30° inclined underground pressure shafts of 1,500 m in length each have been lined by precast concrete segments simultaneously to the TBM heading. Especially the second shaft could be completed in a record of 109 working days respectively with an average daily production of almost 14 m/d! A steel lining with an inner diameter of 3.5 m is underway to be installed in the two shafts. That project might have set a milestone for the execution of inclined shafts - for sure in India but may be even in other countries as well. The paper describes the mechanical excavation of these two shafts under severe conditions in a remote area. |
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10031996 - Published on:
20/01/2009 - Last updated on:
30/09/2018