鉄道営業線近接・直上におけるHPCa工法を適用したラーメン高架橋の構築 (Building of Ridged-frame Viaduct with Half Precast Method Adjacent and Above Operating Railway)
Author(s): |
H. Hattori
T. Kuroiwa T. Hayakawa H. Yoshizumi |
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 2012, n. 3, v. 50 |
Page(s): | 275-281 |
DOI: | 10.3151/coj.50.275 |
- About this
data sheet - Reference-ID
10438684 - Published on:
08/10/2020 - Last updated on:
08/10/2020