How to improve peak time coverage through a smart-controlled MCHP unit combined with thermal and electric storage systems
Author(s): |
C. D. Ummenhofer
J. Olsen J. Page T. Roediger |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Energy and Buildings, March 2017, v. 139 |
Page(s): | 78-90 |
DOI: | 10.1016/j.enbuild.2016.12.086 |
- About this
data sheet - Reference-ID
10470092 - Published on:
27/10/2020 - Last updated on:
27/10/2020