0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

How 'just-in-time' wastages can be quantified: case study of a private condominium project

Author(s):

Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 6, v. 16
Page(s): 621-635
DOI: 10.1080/014461998371926
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/014461998371926.
  • About this
    data sheet
  • Reference-ID
    10213290
  • Published on:
    04/12/2018
  • Last updated on:
    19/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine