Author(s): |
C. Teixidor
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structural Engineering International, February 2007, n. 1, v. 17 |
Page(s): | 53-55 |
DOI: | 10.2749/101686607779938769 |
Abstract: |
This paper describes the design and construction of the glazed dome of the EVO restaurant, situated on top of the recently inaugurated Hesperia Tower hotel, in Barcelona. The construction of the dome required some special processes and solutions which enabled the dome to be built on the ground and then lifted to its final position on top of the tower. The 42 t dome, which is 22 m in diameter, was lifted with its glazed cladding completely installed including all sealings between glass panels. |