0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hormigonado en condiciones meteorológicas adversas: Estudio de los accidentes ocurridos durante el hormigonado de un tablero postesado

Author(s):


Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 190, v. 45
Page(s): 137-143
Abstract:

Casting with heavy rain: Study of the accidents occured when placing concrete on a post-tensioned bridge deck

When placing concrete on a two 35 m length span bridge deck, near Bilbao, several accidents occured: - Collapse of the internal forms made with spanded metal. - Interruption of the placing process and formation of "cold-joints". - Possibility of alteration of fresh concrete due to water action. The study here described deals with the following problems: - Time of tensioning and tensioning operations. - Minimum period before striking. - Shear at the interfaces. - Safety factor of the whole deck.

Available from: ACHE - Asociación Española de Ingeniería Estructural
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076126
  • Published on:
    13/11/2018
  • Last updated on:
    13/11/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine