Horizontal Rotation via Floatation as an Accelerated Bridge Construction for Long-Span Footbridge Erection: Case Study
Author(s): |
Tomasz Siwowski
Artur Wysocki |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Bridge Engineering (ASCE), April 2015, n. 4, v. 20 |
Page(s): | 05014014 |
DOI: | 10.1061/(asce)be.1943-5592.0000693 |
- About this
data sheet - Reference-ID
10088353 - Published on:
02/12/2018 - Last updated on:
02/12/2018