0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Holistisch kybernetisches Kostensteuerungsprozessmodell – Vorplanungs- bis Ausführungsphase

Author(s):
Medium: journal article
Language(s): German
Published in: Bauingenieur, , n. 11, v. 82
Page(s): 504
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10057765
  • Published on:
    05/11/2010
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine