Holistic Framework for Highway Construction Cost Index Development Based on Inconsistent Pay Items
Author(s): |
Hexu Liu
Valerian Kwigizile Wei-Chiao Huang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, July 2021, n. 7, v. 147 |
DOI: | 10.1061/(asce)co.1943-7862.0002080 |
- About this
data sheet - Reference-ID
10604071 - Published on:
26/04/2021 - Last updated on:
26/04/2021