0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):
Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 3, v. 75
Page(s): 58-86
DOI: 10.1061/ciegag.0000010
Abstract:

Thanks to innovative contractual and construction measures, major work on an ambitious, five-level highway interchange in Dallas is expected to be complete by the end of the year, a full 12 months ahead of schedule.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/ciegag.0000010.
  • About this
    data sheet
  • Reference-ID
    10020244
  • Published on:
    23/07/2005
  • Last updated on:
    30/11/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine