0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Herausforderung Instandhaltung Koralmtunnel im Spannungsfeld betrieblicher Verfügbarkeit und Anlagenmehrung

Author(s):


Medium: journal article
Language(s): German
Published in: Geomechanics and Tunnelling, , n. 6, v. 12
Page(s): 652-660
DOI: 10.1002/geot.201900052
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201900052.
  • About this
    data sheet
  • Reference-ID
    10399946
  • Published on:
    12/12/2019
  • Last updated on:
    24/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine