Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Author(s): |
Milad Ghasri
Mojtaba Maghrebi Taha Hossein Rashidi S. Travis Waller |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, November 2016, v. 71 |
Page(s): | 283-293 |
DOI: | 10.1016/j.autcon.2016.08.012 |
- About this
data sheet - Reference-ID
10189314 - Published on:
07/12/2018 - Last updated on:
07/12/2018