터널 주변 폭발로 인해 발생된 버력의 처리시간 예측 (Hauling time prediction of the muck generated by a blasting around a tunnel)
Author(s): |
Kwang-Ho You
Myung-Kyun Son |
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), 30 January 2013, n. 1, v. 15 |
Page(s): | 33-47 |
DOI: | 10.9711/ktaj.2013.15.1.033 |
- About this
data sheet - Reference-ID
10394878 - Published on:
26/11/2019 - Last updated on:
26/11/2019