0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Halbzeit beim Bau der U-Bahn-Linie 3-Nord

Author(s):

Medium: journal article
Language(s): German
Published in: Felsbau-Magazin, , n. 5
Page(s): 289
Keywords:
railway construction TBM drive safety management special foundation engineering

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10064688
  • Published on:
    21/03/2011
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine