Grundinstandsetzung der Wehranlage Untertürkheim

Author(s):
Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 5, v. 93
Page(s): 321-326
DOI: 10.1002/bate.201600028
Abstract:

Reconstruction of the Weir Untertürkheim

After more than 80 years of operation, the Weir Untertürkheim was totally reconstructed between 2007 and 2012. In several phases the concrete structure was rebuilt or enhanced. Gates and drives were replaced by completely new ones. The remedial design required a sheet pile wall around two of the four weir spans while flood discharge had to be ensured. Therefore, hydraulic model tests were carried out. Although surprises were linked to rebuilding an existing structure the restoration could be finished successfully and in line with the budget.

Keywords:
reconstruction rehabilitation weir excavation enclosure hydraulic model test pit wall surrounding
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201600028.
  • About this
    data sheet
  • Reference-ID
    10073097
  • Published on:
    27/06/2016
  • Last updated on:
    04/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine