Ground surface settlement response to subway station construction activities using pile–beam–arch method
Author(s): |
Xiangyu Guo
Zhengzheng Wang Ping Geng Changjian Chen Jing Zhang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, February 2021, v. 108 |
Page(s): | 103729 |
DOI: | 10.1016/j.tust.2020.103729 |
- About this
data sheet - Reference-ID
10526118 - Published on:
11/12/2020 - Last updated on:
19/02/2021