0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Grossprojekte und Ökologie: Rolle und Wirkung ökologischer Massnahmen im Bauablauf

Author(s):
Medium: journal article
Language(s): German
Published in: Schweizer Ingenieur und Architekt, , n. 47, v. 117
DOI: 10.5169/seals-79826
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5169/seals-79826.
  • About this
    data sheet
  • Reference-ID
    10505399
  • Published on:
    23/11/2020
  • Last updated on:
    23/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine