Greater Cairo Wastewater Project: Design of West Bank Stage 1 Works Sewers, Culverts and Pumping Stations
Author(s): |
W. D. Skinner
K. P. Pronske |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers, August 1985, n. 4, v. 78 |
Page(s): | 831-840 |
DOI: | 10.1680/iicep.1985.1037 |
Geographic Locations
- About this
data sheet - Reference-ID
10266286 - Published on:
09/01/2019 - Last updated on:
09/01/2019