0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Government support and risk‐return trade‐off in China's BOT power projects

Author(s):

Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 4, v. 7
Page(s): 412-422
DOI: 10.1108/eb021163
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/eb021163.
  • About this
    data sheet
  • Reference-ID
    10575756
  • Published on:
    27/02/2021
  • Last updated on:
    27/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine