Gestörter Bauablauf - Baubetriebliche Ermittlung von Bauzeitverlängerungen und Berechnung der Mehrkosten
Author(s): |
F. A. Bötzkes
|
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, March 2010, n. 3, v. 87 |
Page(s): | 145-157 |
DOI: | 10.1002/bate.201010013 |
Abstract: |
Disturbed construction process — Determination of extra construction time and calculation of the additional costs of construction.The detection of the disturbed construction process is the most difficult challenge for construction managers. This is not only because of the complexity of disturbed construction processes of large projects, but primarily because of the requirements of demonstration for the legal experts in construction. |
Keywords: |
overall construction time capacity cost empty cost additional costs final account construction process principal-agent relationship contractor bottom up-method construction schedule
|
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10058453 - Published on:
17/11/2010 - Last updated on:
13/08/2014