Gestörter Bauablauf - Baubetriebliche Ermittlung von Bauzeitverlängerungen und Berechnung der Mehrkosten

Author(s):
Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 3, v. 87
Page(s): 145-157
DOI: 10.1002/bate.201010013
Abstract:

Disturbed construction process — Determination of extra construction time and calculation of the additional costs of construction.

The detection of the disturbed construction process is the most difficult challenge for construction managers. This is not only because of the complexity of disturbed construction processes of large projects, but primarily because of the requirements of demonstration for the legal experts in construction.

Keywords:
overall construction time capacity cost empty cost additional costs final account construction process principal-agent relationship contractor bottom up-method construction schedule
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201010013.
  • About this
    data sheet
  • Reference-ID
    10058453
  • Published on:
    17/11/2010
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine