Geotechnical design and construction issues for Lines 1 and 6 of the Naples Underground / Geotechnische Planung und Ausführung der U-Bahnlinien 1 und 6 in Neapel
Author(s): |
Gianpiero Russo
Carlo Viggiani G. M. B. Viggiani |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2012, n. 3, v. 5 |
Page(s): | 300-311 |
DOI: | 10.1002/geot.201200016 |
Abstract: |
Since 1839, when the historical railway Naples - Portici was inaugurated, Naples has been characterized by a significant system of urban and suburban railways. The idea of a fully integrated urban rail network dates back to the 1950s, but construction only began in the 1990s. At present, the system includes 54 km of tracks and 69 stations in operation; ten lines with 93 km of track and a further 30 km of new light rail linking 114 stations with 21 interchanges are planned with the completion of the City Transport Plan. |
Keywords: |
deep excavations ground freezing running tunnels platform tunnels
|
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10066970 - Published on:
05/09/2012 - Last updated on:
13/08/2014