Geomonitoring of the Open-pit Mine Slopes During Subsoil Development
Author(s): |
Roman Shults
Marzhan Nurpeissova Shugyla Burlibayeva Aliya Umirbayeva Turar Turumbetov |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Stavební obzor - Civil Engineering Journal, 30 April 2024, n. 1, v. 33 |
Page(s): | 50-64 |
DOI: | 10.14311/cej.2024.01.0004 |
Abstract: |
The concept of geomonitoring and its role in developing the mining industry as a case study of the development of copper and zinc deposits in central Kazakhstan ("East Saryoba" mine) has been considered. As a crucial element of the geomonitoring concept, the control of the open-pit mine's slope stability has been examined. Geomonitoring is being treated as a combination of geodetic monitoring data and geomechanical properties of the surrounding rocks to analyze the possible slopes' collapses. The refined approach of geomonitoring has been developed to provide appropriate reliability and accuracy. The technology is based on complex knowledge about the geological structure of the object of monitoring and applying state-of-the-art geodetic methods. Research on the geomechanical properties of the open-pit mine has been carried out. The results of these studies have been used to determine the collapse zones of the slopes of the open-pit mine. The limit values for the slopes' collapse zone and inclination angle for the prospective excavation regions in the open-pit mine have been calculated using the equilibrium state equation. Those values, namely, the size of the collapse zone and the slope's inclination angle, were used for the geodetic target setup. As a case study, the displacements of these targets were measured using robotic total stations placed on the control points over the geodetic network. For the installation of both geodetic equipment during the geomonitoring design and accomplishment, the authors developed the permanent measuring station construction, which provides fast and accurate centering. The first results showed that the problem of the geomonitoring design could be solved based on geomechanical rock properties accounting and their combination with the results of geodetic measurements. |
- About this
data sheet - Reference-ID
10789869 - Published on:
20/06/2024 - Last updated on:
20/06/2024