0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Geomonitoring of the Open-pit Mine Slopes During Subsoil Development

Author(s):




Medium: journal article
Language(s): English
Published in: Stavební obzor - Civil Engineering Journal, , n. 1, v. 33
Page(s): 50-64
DOI: 10.14311/cej.2024.01.0004
Abstract:

The concept of geomonitoring and its role in developing the mining industry as a case study of the development of copper and zinc deposits in central Kazakhstan ("East Saryoba" mine) has been considered. As a crucial element of the geomonitoring concept, the control of the open-pit mine's slope stability has been examined. Geomonitoring is being treated as a combination of geodetic monitoring data and geomechanical properties of the surrounding rocks to analyze the possible slopes' collapses. The refined approach of geomonitoring has been developed to provide appropriate reliability and accuracy. The technology is based on complex knowledge about the geological structure of the object of monitoring and applying state-of-the-art geodetic methods. Research on the geomechanical properties of the open-pit mine has been carried out. The results of these studies have been used to determine the collapse zones of the slopes of the open-pit mine. The limit values for the slopes' collapse zone and inclination angle for the prospective excavation regions in the open-pit mine have been calculated using the equilibrium state equation. Those values, namely, the size of the collapse zone and the slope's inclination angle, were used for the geodetic target setup. As a case study, the displacements of these targets were measured using robotic total stations placed on the control points over the geodetic network. For the installation of both geodetic equipment during the geomonitoring design and accomplishment, the authors developed the permanent measuring station construction, which provides fast and accurate centering. The first results showed that the problem of the geomonitoring design could be solved based on geomechanical rock properties accounting and their combination with the results of geodetic measurements.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.14311/cej.2024.01.0004.
  • About this
    data sheet
  • Reference-ID
    10789869
  • Published on:
    20/06/2024
  • Last updated on:
    20/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine