Generation of Construction Scheduling through Machine Learning and BIM: A Blueprint
Author(s): |
Mazen A. Al-Sinan
Abdulaziz A. Bubshait Zainab Aljaroudi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Buildings, 27 March 2024, n. 4, v. 14 |
Page(s): | 934 |
DOI: | 10.3390/buildings14040934 |
Abstract: |
Recent advancements in machine learning (ML) applications have set the stage for the development of autonomous construction project scheduling systems. This study presents a blueprint to demonstrate how construction project schedules can be generated automatically by employing machine learning (ML) and building information modeling (BIM). The proposed solution should utilize building information modeling (BIM) international foundation class (IFC) 3D files of previous projects to train the ML model. The training schedules (the dependent variable) are intended to be prepared by an experienced scheduler, and the 3D BIM files should be used as the source of the scheduled activities. Using the ML model can enhance the generalization of model application to different construction projects. Furthermore, the cost and required resources for each activity could be generated. Accordingly, unlike other solutions, the proposed solution could sequence activities based on an ML model instead of manually developed constraint matrices. The proposed solution is intended to generate the duration, cost, and required resources for each activity. |
Copyright: | © 2024 by the authors; licensee MDPI, Basel, Switzerland. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
2.42 MB
- About this
data sheet - Reference-ID
10773516 - Published on:
29/04/2024 - Last updated on:
05/06/2024