Ganzfertigteile bei der Verbundfahrbahnplatte der Bahretalbrücke - Eine Revision nach Ausführung und baubegleitender messtechnischer Überwachung
Author(s): |
K. Geißler
K. Reintjes J. Rodemann |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, December 2009, n. 12, v. 78 |
Page(s): | 897-906 |
DOI: | 10.1002/stab.200910105 |
Abstract: |
Prefabricated elements for the floor system of Bahretalbridge.The construction of floor systems of composite bridges, using prefabricated elements in concrete, could already achieve acceptance for smaller bridges. Different types were developed: VFT-types, semi-precast construction, precast construction. So far there are only a few cases of prefabricated elements in concrete for bigger bridges in Germany. Using the precast construction presents a possibility to produce floor systems faster and more effective, as done with the Bahretalbridge. |
Keywords: |
road bridges incremental launching expansion measurements
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10061155 - Published on:
19/11/2010 - Last updated on:
13/08/2014