GA-based multi-objective optimization of finance-based construction project scheduling
Author(s): |
Habib Fathi
Abbas Afshar |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | KSCE Journal of Civil Engineering, July 2010, n. 5, v. 14 |
Page(s): | 627-638 |
DOI: | 10.1007/s12205-010-0849-2 |
- About this
data sheet - Reference-ID
10166352 - Published on:
10/12/2018 - Last updated on:
10/12/2018