Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution
Author(s): |
Alireza Birjandi
S. Meysam Mousavi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, April 2019, v. 100 |
Page(s): | 84-102 |
DOI: | 10.1016/j.autcon.2018.11.029 |
- About this
data sheet - Reference-ID
10291864 - Published on:
14/01/2019 - Last updated on:
14/01/2019